Monday, January 27, 2014

Electrical Rough In

I have to start by saying....
                                 
                                             

Wow, I am blown away with the number of people following the blog and stopping by each day. Thank you for your interest, lovely comments and for reading my ramblings! 

Despite today's public holiday we had tradesmen on site, including our ever faithful brickies and an electrician. The complete electrical rough in was finished and the wires hanging all over the place are a testament to my exuberance at the electrical appointment! We were surprised that the electrical went in so soon. Most of the work looks good and all of the lights are marked out exactly where we wanted them. There are a few power points and switches in spots that we wouldn't have chosen (like the bathroom switches being moved out into the bedroom), so hopefully we can discuss a having them relocated with our SS. 

Wires, wires everywhere!

Brickwork up to the eaves nearly done on one side.

No comments:

Post a Comment